Airport Business

JUN-JUL 2018

The airport professional's source for airport industry news, articles, events, and careers.

Issue link: https://airportbusiness.epubxp.com/i/998609

Contents of this Issue

Navigation

Page 38 of 43

June/July 2018 airportbusiness 39 AIRFIELD MAINTENANCE The Tuscaloosa Regional Airport is a general aviation airport with multiple fixed-based operator centers (FBOs) serving some 60,000 charter, cargo, military and private aircraft operations each year as a vital economic engine for the city and the region. The new pipe was installed between the airport's primary Runway 4-22 and the principal Parallel Taxiway A network that provides connectivity from the Runway 4-22 to the airport's terminal area. Installation of new pipes was divided between two storm drainage collection systems between the runway and taxiway. The $1.08 million construction portion of the project was completed in late September after just 116 work days. A significant portion of the storm drainage infrastructure dates to the late 1960s and the concrete pipe and joints along with the brick masonry inlet structures started showing signs of failure. Video inspection inside the lines showed that sediment was infiltrating through separation of some of the pipe joints and, to a greater degree, through failed mortar joints in the brick inlet structures along with the connection points from pipe to inlet structures. These failures, and the resulting sinkholes, provided the justification to rehabilitate the storm drainage system. The project design was undertaken in the summer of 2016 by engineers in the Nashville office of Atkins, a member of the SNC Lavalin Group. Bids were taken in late summer of 2016, and the contract awarded to REV Construction Inc. Construction started in November 2016. "The major elements of the work included 6,454 linear feet of storm drainage pipe that needed to be rehabilitated or replaced," said C. Darren Duckworth, P.E., project manager, aviation services for Atkins. "There were also 15 brick inlet structures that would be replaced with new precast concrete inlet structures along with installation of two replacement headwalls and grading of 372 linear feet of ditch channel. "The existing pipe running under runways or taxiways was rehabilitated with Cured In-Place Pipe (CIPP) linings so we wouldn't have to dig up any of that pavement. Another 3,800 linear feet of pipe ended up being removed and replaced with new pipe. These pipes run under grassy areas that are not subject to traffic loading and lie outside of the Runway Safety Area (RSA) limits and any Taxiway Object Free Area (TOFA) limits. Bid options allowed for either removal and replacement with new pipe or rehab with CIPP linings and the project specifications allowed for multiple options in the material to be used for pipe replacements. The successful bid from REV Construction elected to replace these pipe runs with a corrugated polypropylene pipe in accordance with FAA specification D 701." The products that were submitted and approved included HP Storm pipe and SaniTite HP pipe, both from Advanced Drainage Systems Inc. More than 3,700 feet of HP polypropylene pipe was installed in diameters ranging from 24 to 48 inches in depths with up to 13 feet of cover. The majority of the pipe was dual-wall pipe with a smooth inner wall and a corrugated outer wall. At the locations where the pipe connected into each inlet structure, however, a double-gasket connection was made from the main run of dual-walled HP Storm pipe to a section of triple-walled SaniTite HP pipe. The triple-walled pipe has a smooth exterior, which permits a better seal for the compression gasket at the inlet structure than would have been possible with the corrugated double-wall pipe exterior. "The more usual practice in storm drain installations is to provide oversized openings in the precast structure and to subsequently complete the installation with an annular ring of non-shrink grout to fill the remaining void," explained Duckworth. "Grouted connections were specifically avoided to prevent the risk that any flexure or settlement of pipes might cause a grout failure that could ultimately create a potential point where sediment might be driven into the system with groundwater." The contractor's team worked through the material submittal process with ADS, the precast inlet structure supplier, and the design team to come up with a solution that would work. Mandated in the contract was the requirement that contractor must provide a gasketed or booted watertight connection for all pipe openings. The solution was to use prefabricated compression gaskets of suitable size and performance range to match the outside diameter of the triple-wall polypropylene pipe at each inlet structure. These were supplied to the precast structure manufacturer and precast into the reinforced concrete inlet structures. ADS HP Storm and SaniTite HP pipe are polypropylene (PP) pipes for gravity-flow drainage applications, providing pipe stiffness and premium joint performance. They use advanced polypropylene resin technology with a dual-wall and triple-wall profile design. Polypropylene pipe is approved by the Army Corps of Engineers for storm drainage applications under Section 33 40 00 (Unified Facilities Guide Specifications). The Federal Aviation Authority (FAA) permits polypropylene pipe under airfield pavements per Item D-701, Pipe for Storm Drains and Culverts in AC 150/5370-10G (Standards for Specifying Construction of Airports). "The last thing we wanted to do was to spend more than a million dollars on this rehab effort and then have a joint fail, resulting in sediment getting into the pipe as it did before and creating sinkholes," Duckworth said. "ln light of the sinkhole formations that propelled the need for this project, a major focus of the design was to specify watertight connections to reduce the opportunities for sediment to infiltrate into the rehabilitated system. As an additional measure of protection beyond the usual soil-tight gasket connecting the sections of ADS HP storm pipe, we also specified double gaskets like those that would be used in a sanitary sewer application. This provided an additional measure of sealing beyond typical A 36-inch diameter pipe dual-wall corrugated pipe with the double gaskets being lowered into a trench. The gaskets were protected by a plastic wrap that was removed when the pipe was lowered into the trench and coupled into the receiving pipe segment. Jamie Roberts, Walker Associates Inc.

Articles in this issue

Archives of this issue

view archives of Airport Business - JUN-JUL 2018