Airport Business

OCT 2018

The airport professional's source for airport industry news, articles, events, and careers.

Issue link: https://airportbusiness.epubxp.com/i/1034468

Contents of this Issue

Navigation

Page 31 of 59

32 airportbusiness October 2018 Ali Istchenko, P.Eng. Ali Istchenko started her career at Vancouver Airport Authority (VAA), where she worked her way up to become a project engineer. Her last role with VAA was as building systems coordinator for a project to decommission and replace the 1968-era portion of the domestic terminal building with eight new gates and expanded security checkpoint. In 2015 Istchenko joined Vantage Airport Group. From Vancouver, she was seconded to LaGuardia Gateway Partners (LGP) in New York to support the capture phase of the massive LaGuardia Central Terminal Replacement Project. “The last project I worked on [at Vancouver] had a lot of similarities to the [LaGuardia] Terminal B Redevelopment, with phased demolition, new construction and high standards for operations and passenger experience in the terminal areas surrounding the construction work,” said Istchenko. “It was a huge leap to move from Vancouver to New York and to step into a project this large and complex, but it has been an incredibly rewarding experience.” Istchenko enjoys working with talented professionals who all have a common goal of bringing this new terminal to life. “My job allows me to work cross-functionally with all of these different groups to solve problems and keep the project moving forward while maintaining the integrity of the airport’s operations,” she said. “I love being able to bring people and their perspectives together and to then see the building take shape.” Istchenko is most proud of is the rebuilding of LaGuardia Terminal B. “The site is so constrained for space that it forces a level of creativity with the planning that is second-to-none in order to meet the constructability and operational requirements,” she noted. “We are building the new terminal on all sides, and even over top of the existing facility in order to keep the current terminal operational during construction for the 15 million passengers that pass through each year.” Continued online at www.AviationPros.com/12424149

Articles in this issue

Links on this page

Archives of this issue

view archives of Airport Business - OCT 2018